Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 19 results ...

Chen, L, Manley, K, Lewis, J, Helfer, F and Widen, K (2018) Procurement and Governance Choices for Collaborative Infrastructure Projects. Journal of Construction Engineering and Management, 144(08).

Cho, C, Kim, K, Park, J and Cho, Y K (2018) Data-Driven Monitoring System for Preventing the Collapse of Scaffolding Structures. Journal of Construction Engineering and Management, 144(08).

Faghih, S A M and Kashani, H (2018) Forecasting Construction Material Prices Using Vector Error Correction Model. Journal of Construction Engineering and Management, 144(08).

Hosseini, M R, Maghrebi, M, Akbarnezhad, A, Martek, I and Arashpour, M (2018) Analysis of Citation Networks in Building Information Modeling Research. Journal of Construction Engineering and Management, 144(08).

Ji, W and AbouRizk, S M (2018) Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains. Journal of Construction Engineering and Management, 144(08).

Ji, W, AbouRizk, S M, Zaïane, O R and Li, Y (2018) Complexity Analysis Approach for Prefabricated Construction Products Using Uncertain Data Clustering. Journal of Construction Engineering and Management, 144(08).

Kim, K, Cho, Y and Kim, K (2018) BIM-Driven Automated Decision Support System for Safety Planning of Temporary Structures. Journal of Construction Engineering and Management, 144(08).

Lee, J (2018) Value Engineering for Defect Prevention on Building Façade. Journal of Construction Engineering and Management, 144(08).

Maemura, Y, Kim, E and Ozawa, K (2018) Root Causes of Recurring Contractual Conflicts in International Construction Projects: Five Case Studies from Vietnam. Journal of Construction Engineering and Management, 144(08).

Pomares, J C, González, A and Saura, P (2018) Simple and Resistant Construction Built with Concrete Voussoirs for Developing Countries. Journal of Construction Engineering and Management, 144(08).

Qian, Q and Zhang, L (2018) Impact of Regulatory Focus on Choice of Project-Governance Modes: Role of Tolerance of Opportunistic Behavior. Journal of Construction Engineering and Management, 144(08).

Siebelink, S, Voordijk, J T and Adriaanse, A (2018) Developing and Testing a Tool to Evaluate BIM Maturity: Sectoral Analysis in the Dutch Construction Industry. Journal of Construction Engineering and Management, 144(08).

  • Type: Journal Article
  • Keywords: Building information modelling (BIM); Maturity; Supply chain management; Construction industry;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001527
  • Abstract:
    This study’s objective was to evaluate the status of building information modelling (BIM) implementation within the Dutch construction industry by means of a developed BIM maturity tool that could be applied within the construction industry’s various disciplines. Existing BIM maturity models tend to focus on technological aspects and have often been developed for specific disciplines. This paper first describes the development of a maturity model that enables the assessment of both technological and organizational aspects of BIM and enables comparison of all the disciplines in the construction supply chain. Second, the applicability of the proposed BIM maturity model is explored by using the model in in-depth interviews at 53 Dutch firms that represent the various disciplines within the construction industry. The output of the testing of the BIM maturity model shed light on the current implementation status of individual companies and, when aggregated, of the subsectors present. The latter information is valuable for sectoral associations because it identifies differences and similarities in BIM implementation across subsectors. The main finding is of strong strategic support for BIM among the leading companies evaluated. However, the formalization of BIM-related processes, tasks, and responsibilities is lagging behind BIM developments. Notably, respondents emphasized aspects related to people and culture when it came to implementing BIM, with awareness, education, and training regarded as essential elements in stimulating BIM maturity growth. Based on these findings, priorities have been identified to stimulate the BIM implementation process that can be included in sector-specific or industry-wide policies.

Su, C T, Santoro, M C and Mendes, A B (2018) Constructive Heuristics for Project Scheduling Resource Availability Cost Problem with Tardiness. Journal of Construction Engineering and Management, 144(08).

Tabish, S Z S and Jha, K N (2018) Beyond the Iron Triangle in Public Construction Projects. Journal of Construction Engineering and Management, 144(08).

Techera, U, Hallowell, M, Littlejohn, R and Rajendran, S (2018) Measuring and Predicting Fatigue in Construction: Empirical Field Study. Journal of Construction Engineering and Management, 144(08).

Wang, X, Huang, X, Luo, Y, Pei, J and Xu, M (2018) Improving Workplace Hazard Identification Performance Using Data Mining. Journal of Construction Engineering and Management, 144(08).

Wu, W, Mayo, G, McCuen, T L, Issa, R R A and Smith, D K (2018) Building Information Modeling Body of Knowledge. I: Background, Framework, and Initial Development. Journal of Construction Engineering and Management, 144(08).

Wu, W, Mayo, G, McCuen, T L, Issa, R R A and Smith, D K (2018) Building Information Modeling Body of Knowledge. II: Consensus Building and Use Cases. Journal of Construction Engineering and Management, 144(08).

Zuluaga, C M, Albert, A and Arroyo, P (2018) Protecting Bridge Maintenance Workers from Falls: Evaluation and Selection of Compatible Fall Protection Supplementary Devices. Journal of Construction Engineering and Management, 144(08).